Main unit
Application   For incineration, general and pathological
Capacity     50 – 60 kg/h burn rate
Type   Two combustion chambers type; primary and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unit
Operating time                 Minimum 8 hours daily
Operating temperature      From 850 0C to 1200 0C, Automatic controlled
Residual Ash                     5 to 10%
3.2Â Â Â Â Primary Chamber
Construction   Constructed from heavy duty mild or aluminized steel Or
equal and approved equivalent
Insulation material             Refractory material lining similar or equal to calcium
Silicate and hot face combination of heavy duty brickwork
Internal Construction         Fixed hearth type complete with gratings, concave bottom
and charging door, lined with refractory material
Charging Door                    Suitable for manual loading of wastes and with smooth
Dear seal equivalent of Ceramic seals with hinges.
Door Lock                           Automatic, Electric type
Ash removal door     Provided, for removing resultant bottom ash leftovers                             from the Primary chamber
Gratings     Provided
Loading   Manual loading of waste
Primary Burner                         Fully automatic, with fuel, temperature and speed controls with ignition system, flame detector, Air fan complete with safety features, flame failure, Diesel fired fuel injector type and Flange mounted
Blower   Provided. For supplying excess combustion air through the distribution system with speed control system
Temperature   Minimum exit 850 0C
Observation port   To be provided with protective glass type
3.3Â Â Â Â Â Â Secondary chamber
Construction     Constructed from heavy duty mild or aluminized steel or equal and approved equivalent
Insulation   Refractory material lining
Combustion Temperatures         Above 850 0C, controlled electronically
Gas residue or retention Time        > 2 second at minimum 850 0C
Secondary Burner                     Provided, Diesel fired, fully automatic, with fuel, temperature and speed controls, With ignition system,                                                                 Flame detector, Air fan, Complete with safety features, flame failure Diesel fired fuel injector type.                                                                 Flange mounted
Ejector   Provided, Venturi type, for cooling the flue gases
Combustion Air Fan   Provided for supplying combustion and creating a negative drift and turbulences
Temperature   Maximum 1600 0C
3.4Â Â Â Â Â Â Chimney
Construction     Constructed from heavy duty mild or aluminized steel or equal and approved equivalent                                                                Refractory material lining
Length   10 m above ground
Bore   about 350mm diameter
Discharge temperatures           About 850 0C
Emissions     To comply with standards in section 9 of third schedule of the waste management regulations, 2006.
3.5Â Â Â Â Â Â Electrical System
Control unit                                  Fully automatic with microprocessor based control                                                                     unit (PLC) automating all operations of the                                                                     incinerator. Capable of monitoring all incinerator parameters With large LCD or similar for display of all progress
Parameters i.e. temperature of primary and secondary chambers, turbulence and time
With status lamp
With user of defined and differed programmed operating cycles for different type of loads/conditions
With safety interlocks, display of errors and visible and audio alarms.
System for continuous emission monitoring
Isolator switch                                Supply and install isolator switch 240V, 100A for the                                                                   incinerator unit, including all necessary cables 10m
Distribution Board   Supply and install distribution board. 100 A, complete with MCBs suitable for the rating of the incinerator unit and associated equipment. Wiring  to be done according IEE regulations.
Wiring   Make provisions for wiring the isolator switch, Distribution Board control unit to Incinerator and all associated equipment inside to incinerator room.                                                                      Working length 20m. Wiring to be done using PVC Sheath cable on steel conduits and trucking and in accordance with IEE regulations
Fuel System                                     Supply and install storage fuel tank inside the incinerator room at an elevated position (about 1.5 m above the floor)
Fuel Tank                                          Tank capacity, 400 liters, constructed from preferable suitable metallic material or high temperature resistance material
Fuel type   Diesel
Fuel Lines                                         Supply and install fuel lines, complete with fuel filters, pump, sight glass, fuel level and all other safety devices and connect from fuel tank to incinerator.
Working length , 20m
Fuel pipe material; Special copper pipes or similar                                                                       and approved materials
4Â Â Â Â Â Â Â Â Â Â Â Â Physical characteristics
Main unit                                         Floor mounted, stand alone, fixed hearth type
Dimensions     About 1.2 x 2.2m (WxD)
5Â Operating environment
Power Requirements                     240V,A/C 50Hz, single phase, with PE
Ambient temperature                   10 0C to 40 0C
Relatively humidity                        40% to 90%
6. Accessories
Rack, 2 m long                             1 piece
Waste cart, stainless steel             1 piece
Spare parts
Burner   1 set
Fuel Filters                                       6 sets
All other spare parts                  required for replacement during and after 12 months of operations.   2 pieces of each
8Â Â Â Â Â Â Â Â Â Â Â Â Â Quality Standards
Manufacturing standards             NEMA Kenya Act, 1999
Legal Notice No.121 of 29th September 1999 on waste Management Regulations
EU waste incinerator Directive- EC 76/2000
BS 3316
WHO Emission Standards
World Bank Emission Standards
or any other internationally recognized standards
Conformity to standards                    CE marked or any other internationally recognized documents
9Â Â Â Â Â Â Â Â Â Local back up service
Available   Should be available locally
Capacity to service equipment                                                                       Manufacturer/Agent shall have adequate facilities, spare parts, qualified and skilled technical staff to offer comprehensive maintenance service and spare parts sales for the lifespan of the incinerator
10Â Â Â Â Â Â Delivery point
KEMSAÂ Â Â For inspection and verification
Moi Voi, Makindu
Maragua, Eldama Ravine and Isiolo Hospitals     For installation, testing, NEMA Certification and commissioning
Pre installation works
Provide for foundation plinth, necessary plumbing works, Fuel piping works, Elevated Diesel oil storage tank, electrical works including cabling, trunking and switch gears required to install the incinerator and all its accessories to required IEE standards
Installation and testing   Complete installation and set up of the incinerator at designated as per manufacturer’s instructions
Provide fuel and test run the incinerator for 3 hours daily for 7 days
Training
User training                                         On site user training on operation and daily up keep
Maintenance training                          On-site maintenance training on Preventive Maintenance, repair and trouble shooting
Technical Documentations
User manuals                                        2 sets
Service manuals                                   2 sets
Drawings   2 sets
15Â Â Â Â Â Â Â Commissioning
Testing and Commissioning of the machine to the satisfaction of the user
Warranty
Equipment     Minimum of one year after commissioning on all parts.
Equipment system                                   Nil
17.   Maintenance contract
Comprehensive preventive & repair        service     Provided a 12 months comprehensive preventive and repair service contract inclusive of spare parts and material from date of commissioning
Categories:posts