Tag: device

hot medical waste disposing machine, Operation Condition: 8-16 hr/ day  Control: Built-in data recording Operating temperature: Incinerator  /Primary Combustion Chamber Primary Chamber: 900 â€“ 1200 0C Type: horizontal/vertical Temperature:  1200- 1300 oC Residence time of gases : >2 seconds Ash Residue: <5% of original waste size Ash Handling System: Both Automatic and manual removal of Ash. Must ensure removal/treatment of hazardous remnants of ash Flue gas treatment   system : Capable of treating the flow of flue  gas as the incinerator is operating at its maximum capacity Auxiliary device: Water level gauge, pressure sensor, PH sensor..etc  Auxiliary device: Fuel cut-off device Waste  feeding mechanism: Automatic pneumatic/hydraulic waste loading system or conveyor belt , capacity 650-800 L at a time                                                                                                                                       Chimney (Stack): Type: Vertical type height:>7 meter’ Material: Fireproof cast, stainless steel OUTPUT:  GAS- SMOKELESS,ODORLESS  ASH -Max <5% of original waste size Reduction of Pollutant gas SO2, HCL, HF and line particulate Emission standard: WHO/ European Test report for emission testing provided? Heat exchange mode: Automatic Type: Constant loading, Top LoadingCapacity/Burn Speed per hour: 250 -300 kg/hr Substance:External- 3 layers Internal lining:  a fire proof material of pre-fired refractory bricks Using Aluminium lining, resistant to corrosive Gas or Waste and Also to thermal shockSecondary Combustion Chamber:
hot medical waste disposing machine, Operation Condition: 8-16 hr/ day  Control: Built-in data recording Operating temperature: Incinerator  /Primary Combustion Chamber Primary Chamber: 900 â€“ 1200 0C Type: horizontal/vertical Temperature:  1200- 1300 oC Residence time of gases : >2 seconds Ash Residue: <5% of original waste size Ash Handling System: Both Automatic and manual removal of Ash. Must ensure removal/treatment of hazardous remnants of ash Flue gas treatment   system : Capable of treating the flow of flue  gas as the incinerator is operating at its maximum capacity Auxiliary device: Water level gauge, pressure sensor, PH sensor..etc  Auxiliary device: Fuel cut-off device Waste  feeding mechanism: Automatic pneumatic/hydraulic waste loading system or conveyor belt , capacity 650-800 L at a time                                                                                                                                       Chimney (Stack): Type: Vertical type height:>7 meter’ Material: Fireproof cast, stainless steel OUTPUT:  GAS- SMOKELESS,ODORLESS  ASH -Max <5% of original waste size Reduction of Pollutant gas SO2, HCL, HF and line particulate Emission standard: WHO/ European Test report for emission testing provided? Heat exchange mode: Automatic Type: Constant loading, Top LoadingCapacity/Burn rate per hour: 250 -300 kg/hr Substance:External- 3 layers Internal Liner:  a fire proof material of pre-fired refractory bricks Using Aluminium Liner resistant to corrosive Gas or Waste and Also to thermal shockSecondary Combustion Chamber:
1.A chamber of post combustion of gases A burner of combustion of gases, A device of injection of air allowing a total re-combustion of gases, A device of air inlet of cooling of waste gases, A sheath of evacuation of the gases burnt, Carcass in strong sheet steel with support of connection Composition of the refractory; ï‚·Refractory concrete: Thickness :>150mm Nature: 65%% of Al203 ï‚·Insulate in fibrous panels: Thickness: >85mm Nature: Calcium ï‚·Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of electronic ignition, permanent ventilation,  electromagnetic sluice gate of regulation and isolating valve. ï‚·A secondary injection of air to ensure perfect oxygen content. 2.A control box ensuring the complete cycle of combustion. 3.Fan: ï‚·Electro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and following the control of  the automatic cycle. 4.Controls and regulations: Control box watertight to dust, including: ï‚·A switch circuit breaker for each engine (ventilators and burners). ï‚·A timer with adjustable temporization for the regulation of each burner. ï‚·A regulator with digital watching for the temperature of combustion. ï‚·A regulator with digital watching for the temperature of post-combustion. ï‚·Electric box. 5.The de-ashing must be done in the bottom of the combustion chamber or the de-ashing should be automatic or manual batch de-ashing. 6.Process filtering system: scrubber to be mentioned as optional 7.Emission standards compliance: BS 3316 or equivalent standard 8.Capacity to treat plastic: not less than 40% by weight 9.CE manufacturing compliance: BS EN 746-2-1997
1.A chamber of post combustion of gases A burner of combustion of gases, A device of injection of air allowing a total re-combustion of gases, A device of air inlet of cooling of waste gases, A sheath of evacuation of the gases burnt, Carcass in strong sheet steel with support of connection Composition of the refractory; ï‚·Refractory concrete: Thickness :>150mm Nature: 65%% of Al203 ï‚·Insulate in fibrous panels: Thickness: >85mm Nature: Calcium ï‚·Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of electronic ignition, permanent ventilation,  electromagnetic sluice gate of regulation and isolating valve. ï‚·A secondary injection of air to ensure perfect oxygen content. 2.A control box ensuring the complete cycle of combustion. 3.Fan: ï‚·Electro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and following the control of  the automatic cycle. 4.Controls and regulations: Control box watertight to dust, including: ï‚·A switch circuit breaker for each engine (ventilators and burners). ï‚·A timer with adjustable temporization for the regulation of each burner. ï‚·A regulator with digital watching for the temperature of combustion. ï‚·A regulator with digital watching for the temperature of post-combustion. ï‚·Electric box. 5.The de-ashing must be done in the bottom of the combustion chamber or the de-ashing should be automatic or manual batch de-ashing. 6.Process filtering system: scrubber to be mentioned as optional 7.Emission standards compliance: BS 3316 or equivalent standard 8.Capacity to treat plastic: not less than 40% by weight 9.CE manufacturing compliance: BS EN 746-2-1997