Tag: English

Metro Vancouver is taking more heat over its strategy to build another garbage incinerator, with a new study commissioned by waste firm Belkorp Environmental Services suggesting the move could cost up to $1.3 billion more than expected. The analysis, conducted by ICF International on behalf of Belkorp, comes as Metro Vancouver attempts to take care […]
FARGO, N.D. — California health officials have given note that North Dakota is among six countries that may get Ebola medical waste in case the state has any material to incinerate. In a note published last week, the California Department of Public Health listed North Dakota as one of six states where California pushes medical […]
Smaller cremators that will run diesel and will be capable of doing all the other dogs/cats/pets that we have. We only cremate pets individually so this is what we require. Have your company as member of Markis Hospital waste management group as planer or supplier, contractor of solutions or operating partners of the solution of hospital waste management in the projects we are developing, starting with Larissa and Volos. Members of Markis waste management group will also have the possibility to provide training and technical services to the health sector of Greece and other countries via the TSC which we plan to make the same time in Larissa (enclosed diagram indicates the role of each party joining Markis waste management group). ● Able to burn 25-30kg per hour ● Consist of two chambers to ensure significant reduction in emission ● Be capable of temperature in range of 800c to 1000c ● Low maintenance design ● Must be Diesel fuelled ● Need more than 15amp 220- 250V power ● kW Consumption power consumption to be stated ● Onboard or in-built fuel storage storage tank & should use no more than 12L of dies el per hour to burn 25-30kg of waste ● Solid waste reduction in range of 90-97% ( should be routinely achieved) 1. –  2 medical waste autoclaves 350ltr and 100ltr 2. – 1 medical waste shredder 3. –  3 medical macerators 4. – 27 Waste transfer trolleys.
One (MAIN) chamber only, with two doors Doors with hinges at the center LPG combustible mainly After burner and chimney don′t change MAIN Chamber dimensions [LxWxH]: 2.2m x 4.5m x 2.8m, so we can put two containers within the MAIN chamber Ok per your comment, refractory concrete and fire brick inside the chamber; feed door with refractory concrete Burning Rate:47.5–50kg/hour Minimum Operating Temperature:850o C(primary combustion) Maximum Operating Temperature:1450 oC(Afterburner chamber) Secondary Burning Capacity:Compulsory Density Insulation:20mm High Refractory Casting:Minimum 65mm Heavy duty refracting lining to withstand:1500 oC Average burn out time :maximum:3 hrs Fuel type:Diesel Fuel Consumption in L/hr:7.5 to 9 Residence time in secondary chamber:2sec Residue ash post 100kg:Max 3.8kg 1)      This type is suitable for medical waste, but how many kilos can be put in the incinerator in one time 2)      Q: Operation and maintenance costs, these costs are based on?? What if we use it every day?? 3)      How many hertz do we need for this type of incinerator 4)      Where is the oil tank in the incinerator? 5)      Is it possible to build in not the standard accessories but the high proof accessories? 6)      What are the costs when shipment is to Surinam/South America 7)      How will the inicinerator be delivered? Partly installated or do we have to install it completly?  And in addition, the other models with less burn rate capacity as TS100(PLC); TS50(PLC); TS30(PLC); TS20(PLC) and TS10(PLC), interests also our company. So, would you give also Proforma Invoices of these models in CIF Prices to Port of Abidjan.   Furthermore, as the Incinerators have to be installed at nationwide, there are always great power cuts in our country. So, we would like to know if you can supply each Incinerator with a diesel engine (generator) which power is adapted to the power of the Incinerator unit?
One (MAIN) chamber only, with two doors Doors with hinges at the center LPG combustible mainly After burner and chimney don′t change MAIN Chamber dimensions [LxWxH]: 2.2m x 4.5m x 2.8m, so we can put two containers within the MAIN chamber Ok per your comment, refractory concrete and fire brick inside the chamber; feed door with refractory concrete Burning Rate:47.5–50kg/hour Minimum Operating Temperature:850o C(primary combustion) Maximum Operating Temperature:1450 oC(Afterburner chamber) Secondary Burning Capacity:Compulsory Density Insulation:20mm High Refractory Casting:Minimum 65mm Heavy duty refracting lining to withstand:1500 oC Average burn out time :maximum:3 hrs Fuel type:Diesel Fuel Consumption in L/hr:7.5 to 9 Residence time in secondary chamber:2sec Residue ash post 100kg:Max 3.8kg 1)      This type is suitable for medical waste, but how many kilos can be put in the incinerator in one time 2)      Q: Operation and maintenance costs, these costs are based on?? What if we use it every day?? 3)      How many hertz do we need for this type of incinerator 4)      Where is the oil tank in the incinerator? 5)      Is it possible to build in not the standard accessories but the high proof accessories? 6)      What are the costs when shipment is to Surinam/South America 7)      How will the inicinerator be delivered? Partly installated or do we have to install it completly?  And in addition, the other models with less burn rate capacity as TS100(PLC); TS50(PLC); TS30(PLC); TS20(PLC) and TS10(PLC), interests also our company. So, would you give also Proforma Invoices of these models in CIF Prices to Port of Abidjan.   Furthermore, as the Incinerators have to be installed at nationwide, there are always great power cuts in our country. So, we would like to know if you can supply each Incinerator with a diesel engine (generator) which power is adapted to the power of the Incinerator unit?
Application : four islands in Croatia Capacity/island : 4000 kg/day ; 25000 kg/day ; 31000 kg/day ; 48000 kg/day Burning temperature – over 12000C Two chambers – minimum Emissions – dioxin and heavy metaly – better then Kyoto protocol Emission – monitoring system Waste unloiding – directly from waste track to incinerator Burn Rate(Average kgs/hr)  25 kg   primary chamber  800 degree   secondary chamber  1000 degree   chimney  standard   shredder  separately   Autoclave or microwaves  separately   temperature monitor  attached outside of machine operating  Fuel and electric   –          Toxic and dangerous wastes,   –          Medical pharmaceutical and hospitable liquids  Wastes –          Domestic garbage   –          Electric and electronic wastes –          Industrial wastes –          In General, all type of wastes and garbages 1) working now in new order for Nigeria though our company for Yd-300 x 2 units , this is a job in hand in our customer located in dubai 2) the customer also want also to buy a fuel bulk storage tank  to be for 3 days continuous operation so we hope also you can manufacture it so please give me the best price for fuel bulk storage tank  to be for 3 days continuous operation for YD-300 3) installation must be in the site in Nigeria by your company ,as i know your price rate which you sent to be before 4) what is the best price CIF Nigeria in lagos sea port as i have only price for cif dubai 5) 150 pcs Waste Containers (820 L) fully compatible with the incinerator and clinical waste container washing system.  please send me the price and catalog for this item 6) also they need Automatic Clinical Waste Container Washing System complete in every respect and fully compatible with containers price and catalog 7) 2 units 1.5 tonne Fork Lift  ( if you know good price and quality  company in china) 8) 1 unit Clinical Waste Container Vehicles complete in every respect and fully compatible with containers. 9) Spare Parts For 2 Years Operation & Maintenance  for YD-300 and for the above machines 10) all parts , pipe work electrical work and civil work for incinerator must be provided and material must be quoted The highest temperature that the filter bag can operate continuously is 260C.    In order to add a bag house using our filter products,  you would need to add a water cooling tower or other method to reduce the inlet temperature at the baghouse to less than 260C.    If you cannot lower the temperature below 260C, then we cannot utilize our membrane filter bags.  
Application : four islands in Croatia Capacity/island : 4000 kg/day ; 25000 kg/day ; 31000 kg/day ; 48000 kg/day Burning temperature – over 12000C Two chambers – minimum Emissions – dioxin and heavy metaly – better then Kyoto protocol Emission – monitoring system Waste unloiding – directly from waste track to incinerator Burn Rate(Average kgs/hr)  25 kg   primary chamber  800 degree   secondary chamber  1000 degree   chimney  standard   shredder  separately   Autoclave or microwaves  separately   temperature monitor  attached outside of machine operating  Fuel and electric   –          Toxic and dangerous wastes,   –          Medical pharmaceutical and hospitable liquids  Wastes –          Domestic garbage   –          Electric and electronic wastes –          Industrial wastes –          In General, all type of wastes and garbages 1) working now in new order for Nigeria though our company for Yd-300 x 2 units , this is a job in hand in our customer located in dubai 2) the customer also want also to buy a fuel bulk storage tank  to be for 3 days continuous operation so we hope also you can manufacture it so please give me the best price for fuel bulk storage tank  to be for 3 days continuous operation for YD-300 3) installation must be in the site in Nigeria by your company ,as i know your price rate which you sent to be before 4) what is the best price CIF Nigeria in lagos sea port as i have only price for cif dubai 5) 150 pcs Waste Containers (820 L) fully compatible with the incinerator and clinical waste container washing system.  please send me the price and catalog for this item 6) also they need Automatic Clinical Waste Container Washing System complete in every respect and fully compatible with containers price and catalog 7) 2 units 1.5 tonne Fork Lift  ( if you know good price and quality  company in china) 8) 1 unit Clinical Waste Container Vehicles complete in every respect and fully compatible with containers. 9) Spare Parts For 2 Years Operation & Maintenance  for YD-300 and for the above machines 10) all parts , pipe work electrical work and civil work for incinerator must be provided and material must be quoted The highest temperature that the filter bag can operate continuously is 260C.    In order to add a bag house using our filter products,  you would need to add a water cooling tower or other method to reduce the inlet temperature at the baghouse to less than 260C.    If you cannot lower the temperature below 260C, then we cannot utilize our membrane filter bags.  
We are in the process of building a new hospital waste treatment plant and we are evaluating different technologies from around the world.  We are looking to incinerate approx. 1 to 2 tons of biomedical waste per day using LPG for heating.  Please send me all general information and quotes for machines of all ranges that could meet our needs.  Also, please include emissions reports of all of the various machines that could be of interest to us especially with regards to  dioxins and furals as well as lists of recommendations from past clients.  If you have any government entities using your machines please include lists of whom they are as well as any documentation that you contain that can prove their use.  Timing is also very important to us with regards of when the machines can arrive to Peru and be up and running. Therefore, it would be appreciated if you could include time frames and the whole process from purchase to installation and maintenance.  Burning Rate:5–120kg/hour Minimum Operating Temperature:850o C(primary combustion) Maximum Operating Temperature:1450 oC(Afterburner chamber) Secondary Burning Capacity:Compulsory Density Insulation:20mm High Refractory Casting:Minimum 65mm Heavy duty refracting lining to withstand:1500 oC Average burn out time :maximum:3 hrs Fuel type:Diesel Fuel Consumption in L/hr:7.5 to 9 Residence time in secondary chamber:2sec Residue ash pot 100kg:Max 3.8kg
We are in the process of building a new hospital waste treatment plant and we are evaluating different technologies from around the world.  We are looking to incinerate approx. 1 to 2 tons of biomedical waste per day using LPG for heating.  Please send me all general information and quotes for machines of all ranges that could meet our needs.  Also, please include emissions reports of all of the various machines that could be of interest to us especially with regards to  dioxins and furals as well as lists of recommendations from past clients.  If you have any government entities using your machines please include lists of whom they are as well as any documentation that you contain that can prove their use.  Timing is also very important to us with regards of when the machines can arrive to Peru and be up and running. Therefore, it would be appreciated if you could include time frames and the whole process from purchase to installation and maintenance.  Burning Rate:5–120kg/hour Minimum Operating Temperature:850o C(primary combustion) Maximum Operating Temperature:1450 oC(Afterburner chamber) Secondary Burning Capacity:Compulsory Density Insulation:20mm High Refractory Casting:Minimum 65mm Heavy duty refracting lining to withstand:1500 oC Average burn out time :maximum:3 hrs Fuel type:Diesel Fuel Consumption in L/hr:7.5 to 9 Residence time in secondary chamber:2sec Residue ash pot 100kg:Max 3.8kg
 ملاحظة: المخططات المقدمة هي بغرض التسعير وعلى المقاول تقديم مخططات متكاملة  طبقا لتوصيات الشركة المصنعة وبما يلزمها من ملحقات لعمل الوحدات بصورة سليمة، ويتم التنسيق مع الوزارة لتحديد مكان الوحدة بالموقع العام  توريد وتركيب واختبار محرقة نفايات طبيه بسعة 75  كجم / الساعة تعمل بالغاز ( LPG ) كاملة بجميع مشتملاتها وملحقاتها مع المدخنة طبقاً للمواصفات الفنية والشروط الصحية العامة   إنشاء غرفه خاصة بالمحرقة تتسع لثلاث محارق كما فى البند 3-1-1 وملحق بغرفة المحرقة مخزن للنقايات يستوعب نفايات لمدة  سبعة أيام وتكون جميع الانشاءات من الخرسانة المسلحة مع تجهيز مبنى المحرقة والمخزن بجميع أعمال التوصيلات والكهربائية والاضاءة وأنظمة التغذية بالمياه والصرف  تزويد مبنى المحرقة ومستودع النفايات بنظام اطفاء حريق بالرشاشات يعتمد على مصدر المياه من شبكة الموقع العام وكذلك نظام إنذار حريق يحتوى على حساسات للحرارة والدخان ويكون هذا النظام مرتبط مع أنظمة إنذار الحريق بالمستشفى  توريد وتركيب واختبار نظام تهوية جبرية لغرفة المحرقة والمستودع بواسطة مراوح مركزية ROOF TOP EXHAUET FANS مع تزويدها بفلاتر عالية الكفاءة ( HEPA FILTER  تركب على سحب المراوح مع اخذ معدل تغيير الهواء 5 مرات فى الساعة مع مجارى وجربلات الهواء المطلوبة  توريد وتركيب وإختبار وحدة تكييف منفصلة لمستودع النفايات DUCTED SPLIT UNITES وبسعة كافية للمحافظة على درجة الحرارة الداخلية عند 14 درجة مئوية صيفاً وشتاً  توريد وتركيب وإختبار مخزن تبريد من الحوائط المعزولة سابقة التحهيز بداخل غرفة النفايات وبسعة 35 متر مكعب لحفظ النفايات الطبية في درجة حرارة صفر مئوي لحين حرقها شاملة لوحدة التبريد وجميع الملحقات      BIO MEDICAL INCENERATOR  BIO MEDICAL INCENERATOR  PLANT Fabricating, supplying, installing and commissioning including all assosaries such as controling and measuring devices, all civil works as needed either in concrete or masonary as the case may be necessary room stack height etc as per the indicated requirment in the specification. if any thing is left out, the bidder is required to include the same to make the system complete for treating biomedical waste generated in hospital having bed of 250nos. etc. CAPACITY :- 200BEDS. Operation and Maintenance Manual As built Drawing in 3 set hard copy + Soft copy in Cad Testing and Commissioning  Note: The drawings  are provided for the purpose of pricing and the contractor has to provide an integrated drawings in accordance with the manufacturer’s recommendations and with the necessary addendums  to the work of the units properly, and be coordinated with the ministry to locate the unit place in the general site  Supply, installation and testing of medical waste incinerator with a capacity of 75 kg / hr gas (LPG) complete with all accessories and consequently with the chimney in accordance with the technical specifications and conditions of public health  make a room for the incinerator that  accommodate three incinerators as in item 3.1.1 and attached to the  incinerator room   waste store that accommodate waste for a period of seven days and all the constructions of reinforced concrete with  preparingg  incinerator building  and store with all the work of wiring, electrical and lighting systems, water supply and sanitation   supply incinerator building and the waste warehouse with   a fire extinguish sprinkler system depends on the source of the water from network of teh general site , as well as a fire alarm system contains sensors for heat, smoke and  this system is linked with the hospital fire alarm systems  Supply, installation and testing of the ventilation system of the  incinerator room and the warehouse with  fans ROOF TOP EXHAUET FANS providing them with filters with high efficiency (HEPA FILTER ride to pull fans with taking the air change rate of 5 times per hour with streams and air required grilles    Supply, installation, testing separate conditioning unit for  waste repository DUCTED SPLIT UNITES and capacity sufficient to maintain the internal temperature at 14 degrees Celsius in summer and winter   Supply, installation, testing  of the cooling store of  insulated  prefabricated walls   inside the waste  room with a capacity of   35 cubic meters to save the medical waste at a temperature of zero Celsius till  burning  including the  cooling unit and all accessories