Questo cliente da Casablanca, Marocco, Nord Africa. abbiamo consegnato al cliente nell’anno 2014 e il cliente era soddisfatto del modello YD-150. Il contenitore di spedizione è un contenitore pieno di 1 × 20 piedi. Tutti i nostri inceneritori utilizzano camini in acciaio inossidabile, non in acciaio. Tutti i nostri inceneritori hanno almeno due camere di […]
hot medical waste disposing machine, Operation Condition: 8-16 hr/ day Control: Built-in data recording Operating temperature: Incinerator /Primary Combustion Chamber Primary Chamber: 900 – 1200 0C Type: horizontal/vertical Temperature: 1200- 1300 oC Residence time of gases : >2 seconds Ash Residue: <5% of original waste size Ash Handling System: Both Automatic and manual removal of Ash. Must ensure removal/treatment of hazardous remnants of ash Flue gas treatment system : Capable of treating the flow of flue gas as the incinerator is operating at its maximum capacity Auxiliary device: Water level gauge, pressure sensor, PH sensor..etc Auxiliary device: Fuel cut-off device Waste feeding mechanism: Automatic pneumatic/hydraulic waste loading system or conveyor belt , capacity 650-800 L at a time Chimney (Stack): Type: Vertical type height:>7 meter’ Material: Fireproof cast, stainless steel OUTPUT: GAS- SMOKELESS,ODORLESS ASH -Max <5% of original waste size Reduction of Pollutant gas SO2, HCL, HF and line particulate Emission standard: WHO/ European Test report for emission testing provided? Heat exchange mode: Automatic Type: Constant loading, Top LoadingCapacity/Burn rate per hour: 250 -300 kg/hr Substance:External- 3 layers Internal Liner: a fire proof material of pre-fired refractory bricks Using Aluminium Liner resistant to corrosive Gas or Waste and Also to thermal shockSecondary Combustion Chamber:
30kgs tarifa 60kgs alimentan el incinerador de desechos de quemador de gas y petróleo pequeño para Afganistán Máquina Trabajando modo Petróleo o Gas + Poder Voltaje 220 V Petróleo consumo (encendido / hora) Promedio 13,3 litros / hora / cámara Gas consumo (NG) (m3 / hora) 16,0 (m3 / hora) (NG) Gas consumo (GLP) (m3 […]
Terminiamo questo progetto nell’anno 2010-2011 e la consegna al porto di Hochiminh, Vietnam con un container pieno aperto 1 × 40 piedi. Camera di combustione di grandi dimensioni fino a 4,0 m3 e dimensioni interne 257 x 147 x 108 cm con apertura dello sportello di alimentazione 108 x 128 cm. Questo modello può essere […]
ПЕШАВАР: Даже при наличии четких правил, согласно которым больничные отходы должны сжигаться в течение 24 часов после их сбора, мусоросжигательные заводы в двух крупных больницах в Хайбер-Пахтунхве (КП) не работают, и отходы сбрасываются за пределами больниц. Согласно данным, собранным Агентством по охране окружающей среды (EPA), только в столице провинции ежедневно образуется от 15 до 20 […]
7. Тип отходов: биомедицинские / опасные / муниципальные / мусорные = ВСЕ и смешанные 8. Любое другое: резина, резиновые покрышки, аккумуляторы, зеленые отходы, бумага и картон. 9. Количество отходов, образующихся в день в кг: 3-5 тонн в день. 10. Продолжительность использования инсинератора C в день: 1 C 8 часов / 1 C 16 часов / […]
retención de aire durante al menos 2 segundos a una temperatura inferior a 850C, la combustión Para lograr el efecto adecuado. ? debe ser un incinerador de dos cámaras, primario y secundario Estufas de combustible ? Los productos de desecho para reducir el volumen inicial Posible minimizar (aproximadamente un 5% de cenizas estériles Formulario). Finalidad: […]
Capacity Not less than 500Kg/hr. Operation 24hr-7days/week continuous operation. Combustion chamber 2 combustion chamber. Temp. First combustion chamber 800-1000 C. Secandry combustion chamber 1000-1200 C, with the possibility to be upgraded to 1400 C. Combustion Efficiency 99.99% Retention time Of the flow gases not less than 2 Sec in the hot portion. Excess Oxygen concentration Of primary combustion chamber 3-6% max. Refractory The chambers should be lined with high thermal insulating refractory bricks with suitable thickness and with highly temp. resistance. Not less than 1400 C for the first combustion chamber, and not less than 1600 C for the secandry combustion chamber, and at the same time prevent the Temp. of the outside body of the chamber not higher than 70 C. Doors Should be lined with the same bricks, and the edges lined with special suitable insulating material to prevent any gas escaping, and the doors should be kept under negative pressure during the operation. Air Emission Control System With high destruction and removal efficiency (DRE). Not less than 99.9999 as per KEPA. Wet System If the system equiped with a CEMS washing the flow gas with water, then it should be manufactured from suitable anti corrossion materials, and equiped with pH meter to measure and neutralize the water. It should be able to use the water in closed recycled circuit many times before treating/ discharging into the sewage system in compliance with KEPARS. Chemical dosing It should be equiped with suitable autochemical dosing system to control the pH for the water of the wet scrubber system including sensors. Chimney It should be suitable with the capacity and the technical specifications, with height not less than 12m from ground level. With easy opennable sampling point equal about 3 inch, and the optimum sampling locations is at least 8D downstream direction and 2D upstream from any flow disturbancies. Sampling point Should be equiped with a platform located down the sampling point by a distance not less than 1 m, and equiped with suitable stairs from ground to the port with comfortable slope. Ash Removal It should be auto ash removal system. Fuel It should be dual system, such as diesel and natural gas. Feeding System Should be auto feeding system into primary chamber. Control Room Should be equiped with a control panel shows Temp. of the combustion burners, gas monitoring, digital Temp. indecation for the primary/secondary chambers, digital Temp. indication for the gases…etc. it should be also Auto operation, burnures on/off auto lamps switch, auto start/stop for air emission control system, auto gas continuous monitoring system reading and print out of gas emission parameters…etc. Cooling System The primary chamber should be provided with auto cooling systemthrough nozzles to permit direct cooling if the Temp. will be heigher than 1100 C. Inter-lock system The incinerator should be equiped with inter-lock system to prevent feeding the waste to the primary chamber if the combustion Temp. less than 500 C. Flue treatment and cleaning […]
Capacity Not less than 500Kg/hr. Operation 24hr-7days/week continuous operation. Combustion chamber 2 combustion chamber. Temp. First combustion chamber 800-1000 C. Secandry combustion chamber 1000-1200 C, with the possibility to be upgraded to 1400 C. Combustion Efficiency 99.99% Retention time Of the flow gases not less than 2 Sec in the hot portion. Excess Oxygen concentration Of primary combustion chamber 3-6% max. Refractory The chambers should be lined with high thermal insulating refractory bricks with suitable thickness and with highly temp. resistance. Not less than 1400 C for the first combustion chamber, and not less than 1600 C for the secandry combustion chamber, and at the same time prevent the Temp. of the outside body of the chamber not higher than 70 C. Doors Should be lined with the same bricks, and the edges lined with special suitable insulating material to prevent any gas escaping, and the doors should be kept under negative pressure during the operation. Air Emission Control System With high destruction and removal efficiency (DRE). Not less than 99.9999 as per KEPA. Wet System If the system equiped with a CEMS washing the flow gas with water, then it should be manufactured from suitable anti corrossion materials, and equiped with pH meter to measure and neutralize the water. It should be able to use the water in closed recycled circuit many times before treating/ discharging into the sewage system in compliance with KEPARS. Chemical dosing It should be equiped with suitable autochemical dosing system to control the pH for the water of the wet scrubber system including sensors. Chimney It should be suitable with the capacity and the technical specifications, with height not less than 12m from ground level. With easy opennable sampling point equal about 3 inch, and the optimum sampling locations is at least 8D downstream direction and 2D upstream from any flow disturbancies. Sampling point Should be equiped with a platform located down the sampling point by a distance not less than 1 m, and equiped with suitable stairs from ground to the port with comfortable slope. Ash Removal It should be auto ash removal system. Fuel It should be dual system, such as diesel and natural gas. Feeding System Should be auto feeding system into primary chamber. Control Room Should be equiped with a control panel shows Temp. of the combustion burners, gas monitoring, digital Temp. indecation for the primary/secondary chambers, digital Temp. indication for the gases…etc. it should be also Auto operation, burnures on/off auto lamps switch, auto start/stop for air emission control system, auto gas continuous monitoring system reading and print out of gas emission parameters…etc. Cooling System The primary chamber should be provided with auto cooling systemthrough nozzles to permit direct cooling if the Temp. will be heigher than 1100 C. Inter-lock system The incinerator should be equiped with inter-lock system to prevent feeding the waste to the primary chamber if the combustion Temp. less than 500 C. Flue treatment and cleaning […]