Tag: new

Basic Info. Export Markets:Global Additional Info. Trademark:clover Origin:Clover Product Description we would like to refresh or change incinerator with new one the incinerator contain 3 units each unit 400kg/h, if u interest to generate task using as pls contact me to send u drawing and details. (Baghdad )  Our hospitals demand 3 X Medical Waste […]
Пациенты с этим изнурительным вирусом ежедневно производят 440 галлонов медицинских отходов, включая инструменты, халаты, перчатки, биологические жидкости, простыни, матрасы и многое другое. Это значительное количество медицинских отходов в любой ситуации, но в данном случае это особенно обескураживает, потому что их нужно утилизировать крайне осторожно, чтобы избежать риска распространения инфекции. Что вы делаете с такой проблемой, […]
Heathrow Airport has announced plans to move an incinerator away from Stanwell and create a 15 mile ‘green ring’ around town. A Labour county councillor nevertheless has stated it is like moving pieces around a chess board. “But neighborhood resident Andrew McLuskey has done all of the hard work. “But in saying that, we’re still […]
Metro Vancouver is taking more heat over its strategy to build another garbage incinerator, with a new study commissioned by waste firm Belkorp Environmental Services suggesting the move could cost up to $1.3 billion more than expected. The analysis, conducted by ICF International on behalf of Belkorp, comes as Metro Vancouver attempts to take care […]
We are in the process of building a new hospital waste treatment plant and we are evaluating different technologies from around the world.  We are looking to incinerate approx. 1 to 2 tons of biomedical waste per day using LPG for heating.  Please send me all general information and quotes for machines of all ranges that could meet our needs.  Also, please include emissions reports of all of the various machines that could be of interest to us especially with regards to  dioxins and furals as well as lists of recommendations from past clients.  If you have any government entities using your machines please include lists of whom they are as well as any documentation that you contain that can prove their use.  Timing is also very important to us with regards of when the machines can arrive to Peru and be up and running. Therefore, it would be appreciated if you could include time frames and the whole process from purchase to installation and maintenance.  Burning Rate:5–120kg/hour Minimum Operating Temperature:850o C(primary combustion) Maximum Operating Temperature:1450 oC(Afterburner chamber) Secondary Burning Capacity:Compulsory Density Insulation:20mm High Refractory Casting:Minimum 65mm Heavy duty refracting lining to withstand:1500 oC Average burn out time :maximum:3 hrs Fuel type:Diesel Fuel Consumption in L/hr:7.5 to 9 Residence time in secondary chamber:2sec Residue ash pot 100kg:Max 3.8kg
We are in the process of building a new hospital waste treatment plant and we are evaluating different technologies from around the world.  We are looking to incinerate approx. 1 to 2 tons of biomedical waste per day using LPG for heating.  Please send me all general information and quotes for machines of all ranges that could meet our needs.  Also, please include emissions reports of all of the various machines that could be of interest to us especially with regards to  dioxins and furals as well as lists of recommendations from past clients.  If you have any government entities using your machines please include lists of whom they are as well as any documentation that you contain that can prove their use.  Timing is also very important to us with regards of when the machines can arrive to Peru and be up and running. Therefore, it would be appreciated if you could include time frames and the whole process from purchase to installation and maintenance.  Burning Rate:5–120kg/hour Minimum Operating Temperature:850o C(primary combustion) Maximum Operating Temperature:1450 oC(Afterburner chamber) Secondary Burning Capacity:Compulsory Density Insulation:20mm High Refractory Casting:Minimum 65mm Heavy duty refracting lining to withstand:1500 oC Average burn out time :maximum:3 hrs Fuel type:Diesel Fuel Consumption in L/hr:7.5 to 9 Residence time in secondary chamber:2sec Residue ash pot 100kg:Max 3.8kg
Animal diseases, new virus strains and spread of infectious diseases are only few of the consequences of improper animal waste treatment. Incineration is the way forward for Bio-secure waste disposal. large animal incinerators is recognized as a most efficient solution for significant risk reduction in animal waste management. ※Main Feature: — Three Combustion Chamber — […]
Animal diseases, new virus strains and spread of infectious diseases are only few of the consequences of improper animal waste treatment. Incineration is the way forward for Bio-secure waste disposal. Modern incineration is recognized as a most efficient solution for significant risk reduction in animal waste management.