What are the objectives of incineration?
Incineration plants produce heat and power from waste, reduce waste disposal to landfills, and discharge
harmful emissions and bottom ash. The objective of the incineration plant is to maximize desirable outputs
(heat and power) and minimize undesirable outputs (emissions and bottom ash).
What is incinerators used in hospitals?
Medical incinerators are designed safely to dispose of harmful materials at high temperatures. The process
ensures no harmful gases are released into the environment. Medical waste incinerators have scrubbers to
clean the polluted gases and other particulate matter.
Which is better landfill or incineration?
Its director Jacob Hayler told us: “It is better to recover energy from non-recyclable waste through (incineration), than send it to landfill.” … Mr Hayler says that overall greenhouse
gas emissions from incineration are lower than from landfill.
How does incineration affect our environment?
Pollutants emitted by incinerators that appear to have the potential to cause the largest health effects are
particulate matter, lead, mercury, and dioxins and furans. However, there is wide variation in the contributions
that incinerators can make to environmental concentrations of those contaminants.
HICLOVER is growing brand for environmental protection field, and market share with most of Africa, Middle East, Southeast Asia countries and part of North America, Europe territory. We are trusted partner for governmental organizations, non-profit organizations, international contractors, logistics organizations, military, pet cremation business owners, etc. We have export experience more than 40 countries, including war zone like Iraq, Afghanistan, Somalia, South Sudan. Mobile: +86-13813931455(WhatsApp) Website: www.hiclover.com Email: sales@hiclover.com Email: hicloversales@gmail.com
Nanjing Clover Medical Technology Co.,Ltd.
temperature required for body parts incineration
incinerator for clinical
methods of waste management
haat incinerator india
contact number for hazardous waste management companies in kumasi
https www pvc org en p pvc incineration dioxins
disposal of clinical waste
Suitably designed pollution control devices such as scrubbers, filters or electrostatic precipitators, shall be
installed/retrofitted with the incinerator to achieve emission limits.”
“Each unit shall include a complete vertical exhaust and stack system, including the following features:
• Steel construction.
• Refractory lining in the lower section.
• The exit height of the stack shall be not less than a range of 3-12 metres above ground level depending on
the capacity of the incinerator unit.
• The diameter of the stack shall be selected by the Contractor to deliver an exhaust exit velocity of not less
than 10 metres per second vertically upwards when at full scale operation.
• An emission stack sampling port shall be included immediately above the secondary chamber.
Items/Model | TS10(PLC) | TS20(PLC) | TS30(PLC) | TS50(PLC) | |
Burn Rate (Average) | 10-20 kg/hour | 20-30 kg/hour | 30-50 kg/hour | 50-100 kg/hour | |
Control Mode | PLC Auto. | PLC Auto. | PLC Auto. | PLC Auto. | |
Combustion Chamber | 100L | 210L | 330L | 560L | |
Internal Dimensions | 50x50x40cm | 65x65x50cm | 75x75x60cm | 100x80x70cm | |
Secondary Chamber | 50L | 110L | 180L | 280L | |
Smoke Filter Chamber | Dry Scrubber | Dry Scrubber | Dry Scrubber | Dry Scrubber | |
Feed Mode | Manual | Manual | Manual | Manual | |
Voltage | 220V | 220V | 220V | 220V | |
Power | 0.75Kw | 0.83Kw | 0.99Kw | 1.2Kw | |
Diesel Oil Consumption (kg/hour) | Ave.8.4 | Ave.10.9 | Ave.13.3 | Ave.16.9 | |
Natural Gas Consumption (m3n/hour) | Ave.10.1 | Ave.13 | Ave.16 | Ave.20.2 | |
Temperature Monitor | Yes | Yes | Yes | Yes | |
Temperature Protection | Yes | Yes | Yes | Yes | |
Items/Model | TS100(PLC) | TS150(PLC) | TS300(PLC) | TS500(PLC) | |
Burn Rate (Average) | 100-150 kg/hour | 150-200 kg/hour | 300-400 kg/hour | 500-600 kg/hour | |
Control Mode | PLC Auto. | PLC Auto. | PLC Auto. | PLC Auto. | |
Combustion Chamber | 1200L | 1500L | 2000L | 3000L | |
Internal Dimensions | 120x100x100cm | 150x100x100cm | 170x120x100cm | 210x120x120cm | |
Secondary Chamber | 600L | 750L | 1000L | 1500L | |
Smoke Filter Chamber | Dry Scrubber | Dry Scrubber | Dry Scrubber | Dry Scrubber | |
Feed Mode | Manual | Manual | Manual | Manual | |
Voltage | 220V | 220V | 220V | 220V | |
Power | 1.38Kw | 1.69Kw | 2.57Kw | 4.88Kw | |
Diesel Oil Consumption (kg/hour) | Ave.20.4 | Ave.24.2 | Ave.33 | Ave.44 | |
Natural Gas Consumption (m3n/hour) | Ave. 24.5 |
Ave.29 | Ave.39.6 | Ave.52.8 | |
Temperature Monitor | Yes | Yes | Yes | Yes | |
Temperature Protection | Yes | Yes | Yes | Yes |
4.5.2 If the Contractor is not the original manufacturer of the goods, the Contractor shall provide UNOPS with the benefit of
all manufacturers’ warranties in addition to any other warranties required to be provided under the Contract;
4.5.3 The goods are of the quality, quantity and description required by the Contract, including when subjected to conditions
prevailing in the place of final destination;
The goods are free from any right of claim by any third-party, including claims of infringement of any 4.5.4intellectual property
rights, including, but not limited to, patents, copyright and trade secrets;
4.5.5 The goods are new and unused;
4.5.6 All warranties will remain fully valid following any delivery of the goods and for a period of not less than one (1) year following
acceptance of the goods by UNOPS in accordance with the Contract;
4.5.7 During any period in which the Contractor’s warranties are effective, upon notice by UNOPS that the goods do not conform to
he requirements of the Contract, the Contractor shall promptly and at its own expense correct such non-conformities or, in case of its inability to do so, replace the defective goods with goods of the same or better quality or, at its own
cost, remove the defective goods and fully reimburse UNOPS for the purchase price paid for the defective goods; and,
4.5.8 The Contractor shall remain responsive to the needs of UNOPS for any services that may be required in connection
with any of the Contractor’s warranties under the Contract.
HICLOVER Solution for Fighting COVID-19, with ISO9001/CE Certification.
Medical Waste Incinerator & Auto Roll Air Filter(Air Purification)