De manera atenta solicito me colabore con la cotizacion del incinerador incluyendo envió.Puri group a hospitality business in Indonesia is interested to introduce renewable energy in Indonesia or to use the energy sources for its facility around Indonesia. Kindly request to have more information on incinerator technology as it is needed to process 100 ton to 500 ton waste aday. In the Frame of our Specialized Projects Management, we are currently in search for supplier of Waste Incineration system for hazardous waste, the incineration system will be used for incineration of Prohibited Drugs and toxic materials, waste poultry, Dead Animals “cows, goats”, Spoiled vegetables, Etc. at customs Ports. For that we would like to request for your technical and Financial Proposal for supply , installation and Commissioning of Hazardous Waste Incineration system with incineration capacity of at least 400 Kg/ hr.
Page | 3
The proposal should include the complete description of the whole system: Total cost of supply, Installation, commissioning, Automatic feeding, automatic de- ashing during operation, and efficient gas cleaning system (wet, dry or high temperature ceramic filters), continuous emission monitoring system (CEMS), and all other accessories, Control panel for all components of the system, Troubleshooting alarm system covering all components of the system, to notify the operator for the fault that may arise during the operation, and to perform immediate corrective action, Emergency Stop button that can easily shut off / shut down all major part of the system in case of emergency situation. Primary chamber capacity/ Average capacity per patch Load: 3000 Kg, Incineration capacity per hour 400 Kg/hr., Loading system: side loading, Number of burners: minimum 7 burners, (5 for primary chamber, 2 for secondary chamber), Fuel: Diesel, The system should work continuously for at least 12 hours per day, The primary chamber: Heavy- duty anodized Rust resistant steel casing with minimum thickness 7mm. painted with heat reflective paint, internal heavy duty refractory cement lining and insulation for maximum heat retention. Cost of supply, installation, operation cost including fuel consumption per hour, and cost of other consumable materials treatment materials (consumption rate per hour and unit cost each), delivery time till operation, Layout for the whole three units and gas cleaning systems, considering minimum are required for the system “including enough area for operation and handling”, Confirmation letter that gas emission from the system after gas cleaning should comply with Saudi regulations for gas emissions (stamped letter and Emission comparison table showing the emissions from your system compared with Saudi regulations “attached”)
HICLOVER is growing brand for environmental protection field, and market share with most of Africa, Middle East, Southeast Asia countries and part of North America, Europe territory. We are trusted partner for governmental organizations, non-profit organizations, international contractors, logistics organizations, military, pet cremation business owners, etc. We have export experience more than 40 countries, including war zone like Iraq, Afghanistan, Somalia, South Sudan. Mobile: +86-13813931455(WhatsApp) Website: www.hiclover.com Email: sales@hiclover.com Email: hicloversales@gmail.com